Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S05203
Theme :
Space Shuttle - General (1045 images)
Title : Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was
Caption :
(10/31/2000) --- Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. To the left is the Rotating Service Structure. The Orbiter Access Arm is already extended from the Fixed Service Structure to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections
|
|